CUSTOMER | NAME OF WORK | DETAILS | LOCATION | |
---|---|---|---|---|
PT. FUJI FURUKAWA E & C INDONESIA | TO PROVIDE SUPPORT & INSTALL CONDUIT PIPE FOR ELECTRICAL EQUIPMENT ( MOTOR SENSOR ) ALL PRODUCT YARD | 2017 | MAIN CONTRACTOR | PURWAKARTA |
M/E WORK FOR INSTALLATION OF NEW M/C & RELOCATION OF EXISTING M/C | ||||
DRAIN PIPE OF BCP SYSTEM IN ZONE-2 | ||||
PACKAGE B-1.4 LOW VOLTAGE INSTALLATION WORK | ||||
CONSTRUCTION BATTERY CHARGING PANEL ROOM & RE-WIRING BATTERY CHARGING SYSTEM | ||||
NEW BATTERY CHARGING TANK ( 6 UNITS ) IN ZONE-2 | ||||
FREEMING TANK WORK TO COOLING TOWER SYSTEM | ||||
PT. INDOTRUCK UTAMA | MAINTENANCE PARKING SYSTEM | 2017 | MAIN CONTRACTOR | KARAWANG |
PT. KYOKUTO INDONESIA | INSTALLATION PARKING SYSTEM | 2017 | MAIN CONTRACTOR | KARAWANG |
PT. KANEMATSU KGK | PRIMARY ELECTRICAL WORK ( FROM PLN GARDU TO ELECTRICAL ROOM) | 2017 | MAIN CONTRACTOR | BANDUNG |
PT. NOK INDONESIA | HIGH SPEED SHEET SHUTTER "MONBAN" GF | 2017 | MAIN CONTRACTOR | CIKARANG |
STEEL DOOR MODIFICATION | ||||
PT. S-TECH INDONESIA | INSTALLATION COMPRESSOR SYSTEM PT. RE PAL | 2017 | MAIN CONTRACTOR | SURABAYA |
PT. YKK ZIPPER INDONESIA | LVMDB NO. 4 & DB SDY NO. 4 | 2017 | MAIN CONTRACTOR | CIBITUNG |
PUSH UNIT, POWER & JIG SCREW FOR M/C | ||||
PARTITION IN COMPRESSOR ROOM | ||||
PT. YKK ZIPPER INDONESIA | PIPING PIPE WATER SUPPLY & PIPING PIPE AIR COMPRESSOR FOR NEW W.W.T | 2017 | MAIN CONTRACTOR | CIMANGGIS |
DEMOLISHING & INSTALLATION OF TDM M/C ( 6 UNIT ) | ||||
PT. NISSIN FOOD INDONESIA | HIGH SPEED SHEET SHUTTER "MONBAN" NO. 99703 & 99704 | 2017 | MAIN CONTRACTOR | CIKARANG |
PT. PELANGIRAYA INDONESIA | INSTALLATION A/C DUCT WORK IN FUJI SET INDONESIA | 2017 | MAIN CONTRACTOR | JAKARTA |
FLEXIBLE HOSE TO A/C DUCT SYSTEM | ||||
PRODUCTION ROOM PARTITION WORK ( STEP - 2 ) WITH TEMPERED GLASS t. 8 mm ATTACHED ANTI STATIC FILM t. 0.2 mm IN PT. SUGITY PROJECT. | ||||
EXPANSION CANOPY | ||||
PT. FUJI FURUKAWA E & C INDONESIA | ELECTRICAL INSTALLATION WORK OF BAR & SMALL SECTION MILL OF KOS NEW PLANT ( PACKAGE C-1 ) | 2016 | MAIN CONTRACTOR | PURWAKARTA |
REPOSITION OF BATTERRY CHARGING | ||||
PT. INOAC POLYTECHNO INDONESIA | MECHANICAL & ELECTRICAL WORKS FOR UTILITY FACTORY FOAMING M/C | 2016 | MAIN CONTRACTOR | TANGERANG |
ELECTRICAL WORKS FOR HANNECKLE M/C ( UTILITY FACILITY ) | ||||
PT. YKK AP INDONESIA | CAPACITOR & REACTOR REPLACEMENT WORK FOR S/S-7LVMDB 200 KVA CAPACITOR BANK CUBICLE | 2016 | MAIN CONTRACTOR | TANGERANG |
PT. YKK ZIPPER INDONESIA | DEMOLISHING & SETTING OF NEW M/C ( DIE CAST 4 UNITS ) & NEW INSTALLATION OF PIPING WORK | 2016 | MAIN CONTRACTOR | CIMANGGIS |
PT. YKK ZIPPER INDONESIA | CEILING WORK FOR ELASTIC AREA | 2016 | MAIN CONTRACTOR | CIBITUNG |
REPAIRING OF LVMDB NO. 4 & DB SDY NO. 4 | ||||
M & E WORK FOR NO. 9 MONOFILAMENT & DRYER M/C | ||||
POWER FOR DTY AHU | ||||
M & E WORK FOR PIRN WINDER M/C | ||||
FAULTY SUPPORT & RE-PAINTING WORK OF SILO STRUCTURE | ||||
PT. YKK ZIPCO INDONESIA | M & E WORK FOR DIE CAST M/C ( 7 UNITS ) | 2016 | MAIN CONTRACTOR | CIBITUNG |
CHILLED WATER SUPPLY PUMP FOR DIE CAST AREA | ||||
INSTALLATION OF WATER SUPPLY, COMPRESSED AIR PIPING & POWER WIRING | ||||
PT. KYOKUTO INDONESIA | MAINTENANCE OF PARKING SYSTEM IN PT. INDOTRUCK UTAMA | 2016 | MAIN CONTRACTOR | KARAWANG |
PT. TOKO ENGINEERING INDONESIA | MECHANICAL & ELECTRICAL WORKS FOR BAR & SMALL MILL | 2016 | MAIN CONTRACTOR | TANGERANG |
TEMPORARY CONSTRUCTION POWER PLANT ( R2 ) | ||||
PT. DAIDO INDONESIA MANUFACTURING | REPLACEMENT CHAIN CONVEYOR FOR 4 LINE | 2015 | MAIN CONTRACTOR | CIKAMPEK |
RELAY TEST, VCB TRIP TEST & MISCELLANEOUS TEST | ||||
PT. INOAC POLYTECHNO INDONESIA | PANEL FOR TPV | 2015 | MAIN CONTRACTOR | TANGERANG |
ELECTRICAL WORK FOR PAINTING BOOTH | ||||
CABLE RACK FOR OUTPUT PP - PRODUCTION MACHINE | ||||
CABLE RACK FOR BOOTH / OVEN PANEL | ||||
REPLACEMENT WORK FOR PAINT LINE | ||||
PT. MAYEKAWA INDONESIA | PIPING SYSTEM & ELECTRICAL WORK FOR ATI FACTORY - 2 | 2015 | MAIN CONTRACTOR | SURABAYA |
PT. ALTECH | SERVICE INSTALLATION MECHANICAL & ELECTRICAL | 2015 | MAIN CONTRACTOR | SUKABUMI |
MECHANICAL & ELECTRICAL FOR CHILLER SYSTEM NO. 2 | ||||
PT. KONOIKE TRANSPORT INDONESIA | UNLOADING, OPEN CASE, POSITIONING OF MACHINE | 2015 | MAIN CONTRACTOR | CIBITUNG |
HIROCHIKU CO. LTD | MODIFICATION OF OIL TO LNG ( LINE B ) | 2015 | MAIN CONTRACTOR | KARAWANG |
DUCTING PLATE | ||||
DUCTING FOR HURRY MELTER III - 1000 | ||||
PT. YKK AP INDONESIA | ANALYSYS OF D/G SET EMISSION EXHAUST GAS | 2015 | MAIN CONTRACTOR | TANGERANG |
PT. YKK ZIPPER INDONESIA | MECHANICAL & ELECTRICAL WORK FOR NEW PAINTING M/C | 2015 | MAIN CONTRACTOR | CIMANGGIS |
REPLACEMENT WORK FOR HYDRANT PILLAR NO. 45 | ||||
CLEANING & REPAINTING FOR DUST COLLECTOR DIE CAST LINE | ||||
FLOW METER FOR INCENERATOR | ||||
PT. YKK ZIPPER INDONESIA | FIRE ALARM SYSTEM FOR GENSET ROOM | 2015 | MAIN CONTRACTOR | CIBITUNG |
CORRODED PIPE FOR COOLING TOWER | ||||
M & E WORKS FOR NEW INSPECTION M/C & SEWING M/C | ||||
PT. YKK ZIPCO INDONESIA | CIVIL, MECHANICAL & ELECTRICAL WORK FOR INSATLLATION OF NEW BOILER | 2015 | MAIN CONTRACTOR | CIBITUNG |
COVER FOR PIT | ||||
FOUNDATION WORK & REPLACEMENT FOR NO. 12 DYEING M/C | ||||
TABLE FOR SCALE | ||||
STEEL PLATE FOR HIRAKAKU M/C & PLATING M/C | ||||
RELOCATION WORK FOR EXISTING PRESS M/C FROM ZIPCO-3 TO ZIPCO - 5 | ||||
PT. ITO TAKA CONSTRUCTION | MECHANICAL & ELECTRICAL WORK OF BUILDING FACILITY FOR UNICRAFT NAGURA PROJECT | 2014 | MAIN CONTRACTOR | KARAWANG |
MECHANICAL & ELECTRICAL WORK OF PRODUCTION M/C LOAD FOR UNICRAFT NAGURA PROJECT | ||||
MECHANICAL & ELECTRICAL WORK OF OHKUMA | ||||
PT. GRAND PURI MITRA INTERNATIONAL | MECHANICAL & ELECTRICAL WORK FOR GRAND PURI HOTEL | 2014 | MAIN CONTRACTOR | CIKARANG |
MECHANICAL & ELECTRICAL WORK FOR GRAND PURI APARTMENT | ||||
PT. FUJI FURUKAWA ENGINEERING | SUPPLY OF MATERIALS FOR TIGAR 50 TPD PROTOTYPE PLANT ( IHI INDONESIA ) | 2014 | MAIN CONTRACTOR | JAKARTA |
PT. SHARP ELECTRONIC INDONESIA | DRAIN SYSTEM FOR BOILER ( CABINET & DOOR VIU ) | 2014 | MAIN CONTRACTOR | CAKUNG |
PT. NEC INDONESIA | 1 YEAR BACKUP INSTALL OF DATA CABLE | 2014 | MAIN CONTRACTOR | CIKAMPEK |
MAINTENANCE SERVICE CONTRACT OF PUBLIC ADDRESS SYSTEM | ||||
AS-BUILD MAKING & ENGINEERING WORK | ||||
PT. YKK ZIPPER INDONESIA | WATER SUPPLY PIPE FOR MONOFILAMENT M/C | 2014 | MAIN CONTRACTOR | CIBITUNG |
REPAIRING OF FA PANEL & SURGE ARRESTER | ||||
COVER PLATE FOR MEZZANINE FLOOR ( SPINNING AREA ) | ||||
PT. METAL ONE INDONESIA | SECONDARY WIRING OF M/C | 2014 | MAIN CONTRACTOR | CIKARANG |
LAN SYSTEM | ||||
POWER WIRING FOR CROSS UNIT & VACUUM M/C | ||||
PT. TOKO ENGINEERING INDONESIA | MECHANICAL & ELECTRICAL WORK OF NEW OFFICE & WARE HOUSE | 2014 | MAIN CONTRACTOR | TANGERANG |
PT. INTER ACT JAKARTA | LAN SYSTEM & PUBLIC ADDRESS SYSTEM FOR EXPANTION MANUFACTURE AREA | 2014 | MAIN CONTRACTOR | SUBANG |
PABX SYSTEM | ||||
INSTALLATION DATA OF B1 FOR FOUNDATION AREA | ||||
PT. TOSPLANT ENGINEERING INDONESIA | ELECTRICAL WORK FOR TJP REPLACING LIGHTNING PROJECT | 2014 | MAIN CONTRACTOR | CIKARANG |
PT. FUJI FURUKAWA E & C INDONESIA | MECHANICAL & ELECTRICAL WORK OF FURUKAWA INDOMOBIL BATTERY MFG PROJECT | 2014 | MAIN CONTRACTOR | PURWAKARTA |
SECONDARY MECHANICAL WORK | ||||
MECHANICAL & ELECTRICAL WORK OF WWTP AREA | ||||
COOLING TOWER PIPE, PANEL & INSTALLATION | ||||
ELECTRICAL MANHOLE RELOCATION ( GUARD HOUSE ) | ||||
INSTALLATION PP PIPE OF SCRUBBER IN ZONE 2 | ||||
PT. TATA NUSA TIARA INTERNATIONAL | M/E DESIGN & THE DESIGN SUPERVISION SERVICE FOR PT. ANEKA TUNA INDONESIA 2nd FACTORY | 2013 | MAIN CONTRACTOR | PANDAAN |
PT. S-IK INDONESIA | RELOCATION WORK FOR EXTRUDER M/C ( LINE M ) | 2013 | MAIN CONTRACTOR | CIKARANG |
POWER WIRING WORK FOR EXTRUDER M/C LINE M | ||||
COOLING WATER PIPING, VACUUM PUMP PIPING & COMPRESSOR PIPING WORK | ||||
DUCTING WORK ( LINE M ) | ||||
PARTITITION PLASTIC DOOR EXTRUDER M/C LINE M ( 2nd, 3rd & TOP ) | ||||
VENTILATION WORK OF INVERTER PANEL FOR EXTRUDER | ||||
PT. TOSPLANT ENGINEERING INDONESIA ( KERAMASAN - PALEMBANG ) | SUPPLY LIGHTING FIXTURES & ACCESSORIES | 2013 | MAIN CONTRACTOR | PALEMBANG |
ENGINEERING WORK FOR LIGHTING & SMALL POWER SYSTEM ( INDOOR PORTION ) 80 MW GAS | ||||
PT. TOSPLANT ENGINEERING INDONESIA ( KANSAI PAINT - CIKARANG BARAT ) | MECHANICAL INSTALLATION WORK FOR KPIN F-2 | 2013 | MAIN CONTRACTOR | CIKARANG |
MECHANICAL PIPING & INSULATION WORK FOR KPIN | ||||
ELECTRICAL WORK FOR KPIN | ||||
TEMPORARY HOUSE WORK FOR KPIN F-2 | ||||
PT. YKK AP INDONESIA | RENOVATION OF FIRE HYDRANT SYSTEM | 2013 | MAIN CONTRACTOR | TANGERANG |
INSTALLATION OF KWH METER FOR CONTAINER HEATER PANEL | ||||
RECTIFIER CABLE WIRING WORK | ||||
PT. MEGMILK SNOW BRAND | MECHANICAL & ELECTRICAL WORK FOR SNOW BRAND | 2013 | MAIN CONTRACTOR | CIKARANG |
SECONDARY WIRING & PIPING WORK | ||||
MAIN WATER FILTER | ||||
TABLE FOR GRINDER MACHINE | ||||
PT. IHARA MFG. INDONESIA | SLUG CAR HM - III - 1500 | 2013 | MAIN CONTRACTOR | CIBITUNG |
TROLLY SLUG CAR HM - III - 1500 | ||||
PT. INOAC POLYTECHNO INDONESIA | INSTALLATION OF EARTH FAULT ALARM SYSTEM | 2013 | MAIN CONTRACTOR | TANGERANG |
TEMPORARY FIRE ALARM WORK | ||||
PT. TOKYO KOEKI INDONESIA | WATER SUPPLY & DRAINAGE PIPING SYSTEM FOR PLAZA TOWER | 2013 | MAIN CONTRACTOR | JAKARTA |
PT. INDONESIA STEEL TUBE WORKS. | 135 KVA GENSET INSTALLATION WORK | 2013 | MAIN CONTRACTOR | JAKARTA |
PT. YKK ZIPCO INDONESIA | REPLACEMENT OF AXIAL FAN FOR BARREL PEEL ROOM | 2013 | MAIN CONTRACTOR | CIBITUNG |
CORRODED AIR SUPPLY FAN FOR DIE CAST AREA | ||||
PT. INOAC POLYTECHNO INDONESIA | HYDRANT PIPING SYSTEM | 2013 | MAIN CONTRACTOR | KARAWANG |
INSTALLATION OF AUTOMATIC FIRE ALARM SYSTEM | ||||
INSTALLATION OF LIGHTING SYSTEM | ||||
PT. METAL ONE INDONESIA | MECHANICAL & ELECTRICAL WORKS | 2013 | MAIN CONTRACTOR | CIKARANG |
PT. DAIDO INDONESIA MANUFACTURING | REPLACEMENT FOR DUST COLLECTOR IMPELLER | 2013 | MAIN CONTRACTOR | CIKAMPEK |
CANOPY OF DUST COLLECTOR NO. 4 | ||||
PT. HIROCHIKU ASIA INDONESIA | TOP COVER & ALUMINIUM MELTING FURNACE REMODELING ( ASTRA HONDA MOTOR ) | 2013 | MAIN CONTRACTOR | KARAWANG |
INSTALLATION OF HOLYMESSY E 2000 S ( HPM ) | ||||
LINE E MELTING FURNACE | ||||
PT. ITO TAKA CONSTRUCTION | MECHANICAL & ELECTRICAL WORK FOR PT. KAWAI KASEI NEW FACTORY | 2012 | MAIN CONTRACTOR | KARAWANG |
MECHANICAL & ELECTRICAL WORK FOR PT. KCF IND. NEW FACTORY | ||||
PT. NEC INDONESIA | RAISED FLOOR FOR IT ROOM ( YAZAKI - SUBANG ) | 2012 | MAIN CONTRACTOR | DEPOK |
UTP CABLING SYSTEM ( YAZAKI - TRAINING CENTER ) | ||||
TELEPHONE CABLING SYSTEM YAZAKI SUBANG | ||||
PUBLIC ADDRESS SYSTEM FOR YAZAKI SUBANG FACTORY | ||||
PT. S-IK INDONESIA | PAGING SYSTEM FOR PRODUCTION & WAREHOUSE | 2012 | MAIN CONTRACTOR | CIKARANG |
COOLING WATER, VACUUM PUMP & COMPRESSOR PIPING WORK ( LINE J ) | ||||
MIDDLE HOPPER M/C LINE J ( SUS 304 ) | ||||
RELOCATION WORK FOR LINE J | ||||
PT. YKK ZIPCO INDONESIA | MECHANICAL & ELECTRICAL WORKS FOR DIE CAST M/C ( 8 UNITS ) | 2012 | MAIN CONTRACTOR | CIBITUNG |
ELECTRICAL WORK FOR MELTING FURNACE | ||||
PT.YAMAHA MOTOR MANUFACTURING WEST JAVA | MECHANICAL & ELECTRICAL WORKS FOR ENGINE LINE A FACTORY - 1 | 2012 | MAIN CONTRACTOR | KARAWANG |
INSTALLATION FUEL PUMP OF FIRING BENCH FOR LINE A & B | ||||
GASOLINE PIPE FOR FACTORY 1 & 2 | ||||
MECHANICAL & ELECTRICAL WORKS FOR WARMING UP | ||||
ELECTRICAL WORK & FABRICATION BUCKET FOR SHOT BLAST MANUAL | ||||
MODIFICATION SAFETY LIFTER OF FURNACE LINE C FOR DIE CASTING | ||||
PT. YKK AP INDONESIA | REPLACEMENT OF EXISTING FAULTY PANELS | 2012 | MAIN CONTRACTOR | TANGERANG |
PT. SUZUKI INDOMOBIL MOTOR | MODIFICATION OF MAIN COOLING WATER PIPING | 2012 | MAIN CONTRACTOR | TAMBUN |
RENOVATION WORK FOR COOLING TOWER | ||||
COOLING WATER PIPING WORK FOR INJECTION M/C | ||||
BO 1 / BO 2 INNER PIPING CHANGE WORK | ||||
PT. NEC INDONESIA | YAZAKI TRAINING CENTER - SUBANG UTP CABLING SYSTEM | 2012 | MAIN CONTRACTOR | CIKAMPEK |
TRINITY INDUSTRIAL CORP. | TOP COAT SMALL BOOTH | 2012 | MAIN CONTRACTOR | KARAWANG |
UNDER COAT SMALL BOOTH | ||||
MECHANICAL & ELECTRICAL WORK | ||||
LIGHTING FIXTURES | ||||
MANUAL DAMPER | ||||
COLD INSULATION WORK | ||||
CHILLED WATER TANK CAP. 200 M³ | ||||
PAINT MIXING ROOM EXHAUST FAN | ||||
ELECTRICAL WORK OF # 2 PAINT SHOP PROJECT | ||||
PARTITION WORK FOR CHILLER ROOM | ||||
JIG & DOLLY CLEANING & PAINT HOSPITAL | ||||
WATER SOFTENER | ||||
PARTS LIST CHILLER SYSTEM | ||||
DOOR & WINDOW | ||||
TOP COAT INSPECTION LIGHTING WORK | ||||
PT. TOYOTA TSUSHO MECHANICAL & ENGINEERING SERVICE INDONESIA | SLUDGE DOLLY & SLUDGE DOLLY YARD - SUGITY | 2012 | MAIN CONTRACTOR | KARAWANG |
CURTAIN BETWEEN PROCESSAND PROCESS - SUGITY | ||||
HIGH VISCOS ENCLOSURE + AC, AC FOR PRIMER & TOP COAT | ||||
WATER PUMP & DRAIN PIPING - SUGITY | ||||
PT. YKK ZIPPER INDONESIA | PARTS & MODIFICATION OF PARTS FOR NO. 4 SDY M/C | 2012 | MAIN CONTRACTOR | CIBITUNG |
INSULATION OF MAIN HOPPER & SECONDARY DRYER M/C FOR NO. 8 MONOFILAMENT | ||||
INSULATION OF EXTRUDER BODY & HEAD FOR NO. 8 MONOFILAMENT | ||||
SURGE COUNTER BOX FOR 1 UNIT LIGHTING HEAD ( KAWASAN ) | ||||
FIRE ALARM SYSTEM FOR GBJ / WAREHOUSE ( PPD ) | ||||
EMERGENCY ALARM FOR SECURITY SYSTEM |